无码人妻丰满熟妇区五十路_国产欧美日韩综合视频专区_欧美大荫蒂毛茸茸视频_国产精品理论片在线观看

Service Hotline : 400-690-2050

Contact Us

Service Hotline : 400-690-2050
Address: Guang'an Road, Bao'an District, Shenzhen Xin'an Section 147-3

Industry News

Position : Details
Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:771     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
色综合天天综合网国产成人网 | 全球最大AV在线观看 | 丁香婷婷激五月天 | 中文字幕观看2019 | 成人午夜电影在线免费观看 | 亚洲国产综合久久 | 狠狠色噜噜狠狠狠狠888米奇v | 精品成人18秘 亚洲AV蜜臀 | 日本理伦一区二区三区 | 国产做爰XXXⅩ高潮野外 | WWW.YW193.COM| 国产精品久久久久国产A级 囯产激情av无码毛片久久 | 国产偷人妻精品一区二区在线 | 亚洲欧美国产探花传媒中文 | 日日躁夜夜躁狠狠躁AⅤ蜜 99riAV视频一区二区 | 91精品久久香蕉国产线看观看 | 情侣酒店普通话对白清晰人妻 | 国产AV无码一区二区 | AVJIZZ黄色AV少妇 | avtt在线播放| 河北真实伦对白精彩脏话 | 九九99国产视频导航 | 欧美寡妇大战黑人一级毛片 | 果冻传媒性BBB与ⅩⅩⅩ | 香港三日本8三级少妇 | 日本韩国一区二区三区视频 | 亚洲影视成人一本AV | 国产91色在线观看 | 91久久人澡人妻人人做人精品 | 大陆搡BBBBB搡BBBBBB| 国产又大又硬又粗又长视频 | 成人免费色情网站 | 中国最新美女菊爆视频 | 日韩精品久久久久久免费 | 一区二区无码影院成人 | 黄色在线观看视频 | 中文字幕无码永久无线 | 极品嫩苞撕裂哭叫灌白浆在线观看 | 国产无吗一区二区三区在线欢 | 国产嫩草影院 精灵九色 | 亚洲AV成人片无码网站 |